Data Center Decommissioning

Power down. Pack out. Hand back the keys.

Decommissioning a production environment is a high-stakes project. One missed cable, one mishandled drive, one delayed pickup — and the timeline (and risk) compounds. TRG runs the whole engagement so your team can stay focused on what comes next.

Scope

From a partial cage to a full facility shutdown.

We've decommissioned colocation deployments, on-prem corporate data centers, telecom central offices, and hyperscale white space. The methodology is the same: scope it precisely, execute it on schedule, document everything.

50K+
sq ft engagements
100%
asset-tagged
24h
quote turnaround
48
states served
Decommissioned racks
How a project runs

Six phases. One project manager. Zero surprises.

  1. Phase 01

    Site Survey

    Walk-through, scope confirmation, hazard review, photo documentation. Free of charge.

  2. Phase 02

    SOW & Schedule

    Detailed statement of work, dependency map, change-window calendar aligned to your team.

  3. Phase 03

    Asset Audit

    Pre-disconnect serial capture, photo, and manifest — your authoritative record of what was in the room.

  4. Phase 04

    De-installation

    Power-down sequencing, fiber harvest, cable mining, rack disassembly with proper PPE and lift gear.

  5. Phase 05

    Sanitization

    On-site drive removal, NIST 800-88 wipe or witnessed shred. Serialized certificates issued same-day.

  6. Phase 06

    Transport & Closeout

    GPS-tracked freight to our facility, broom-clean walk-through, final reporting & settlement statement.

Asset warehouse intake
Logistics

Locked trailers. GPS routes. Insured end-to-end.

Once equipment leaves your dock, it's tracked the entire way to our Scottsdale intake floor — where every asset is rescanned against your departure manifest before it moves to test, wipe, remarket, or recycle.

Plan your decommission →